Regional Office, DoR, Phuentsholing hereby issues the letter of Acceptance for the work “Construction of R.C.C. Cantilever Retaining Wall at Chungpathang Bridge, Samtse Location: 14km”, (Package-A-III) –
Last modified: January 6, 2022
January 6, 2022| Tender Notifications| Regional office, Phuentsholing
Regional Office, DoR, Phuentsholing hereby issues the letter of Acceptance for the work “Construction of R.C.C. Cantilever Retaining Wall at Chungpathang Bridge, Samtse Location: 14km”, (Package-A-III) –
Last modified: January 6, 2022
March 20, 2026
Ministry of Infrastructure and Transport,
Drentoen Lam, Thimphu, Bhutan.
Tel: +975-2-327998/322182/327451
Post Box: 791